Pile Cut off Level – Pile Chipping – Reasons & Procedure (WITH PICTURES)

Saad Iqbal | 🗓️ Modified: October 29, 2014 | ⏳ Read Time: 5 min | 👁 Post Views: 1598

As per the definition, the pile cut off level is the elevation up to which the concrete of the pile head is chipped or cut off while exposing rebar. It is an important design parameter in case of pile foundation that allows the rebar of pile to embed in pile cap and uniformly distribute the … Read more

Difference between a culvert and a bridge:

Saad Iqbal | 🗓️ Modified: November 9, 2013 | ⏳ Read Time: 7 min | 👁 Post Views: 1264

A very common confusion between two vital structures is present among students and engineers as well that is “What is the difference between culvert and a bridge”. Culvert and a bridge both span a clear space and looks similar to each other, but there is a clear difference between their purpose as well as their … Read more